OPAC header image
Amazon cover image
Image from Amazon.com
Image from OpenLibrary

Principles of sequencing and scheduling / Kenneth R. Baker, Dan Trietsch.

By: Contributor(s): Material type: TextTextPublisher: Hoboken, N.J. : John Wiley, ©2009Description: 1 online resource (xv, 493 pages) : illustrationsContent type:
  • text
Media type:
  • computer
Carrier type:
  • online resource
ISBN:
  • 9781119262602
  • 1119262607
Subject(s): Genre/Form: Additional physical formats: Print version:: Principles of sequencing and scheduling.DDC classification:
  • 658.5/3 22
LOC classification:
  • TS157.5 .B35 2009eb
Online resources:
Contents:
Introduction -- Single-machine sequencing -- Optimization methods for the single-machine problem -- Heuristic methods for the single-machine problem -- Earliness and tardiness costs -- Sequencing for stochastic scheduling -- Safe scheduling -- Extensions of the basic model -- Parallel-machine models -- Flow shop scheduling -- Stochastic flow shop scheduling -- Lot streaming procedures for the flow shop -- Scheduling groups of jobs -- The job shop problem -- Simulation models for the dynamic job shop -- Network methods for project scheduling -- Resource-constrained project scheduling -- Safe scheduling for projects -- Appendix A: Practical processing time distributions -- Appendix B: The critical ratio rule -- Appendix C: Integer programming models for sequencing.
Star ratings
    Average rating: 0.0 (0 votes)
No physical items for this record

Includes bibliographical references and indexes.

Introduction -- Single-machine sequencing -- Optimization methods for the single-machine problem -- Heuristic methods for the single-machine problem -- Earliness and tardiness costs -- Sequencing for stochastic scheduling -- Safe scheduling -- Extensions of the basic model -- Parallel-machine models -- Flow shop scheduling -- Stochastic flow shop scheduling -- Lot streaming procedures for the flow shop -- Scheduling groups of jobs -- The job shop problem -- Simulation models for the dynamic job shop -- Network methods for project scheduling -- Resource-constrained project scheduling -- Safe scheduling for projects -- Appendix A: Practical processing time distributions -- Appendix B: The critical ratio rule -- Appendix C: Integer programming models for sequencing.

Print version record.

There are no comments on this title.

to post a comment.

Find us on the map

Contact Us

Amarkantak, Village : Lalpur
Dist : Anuppur,
Madhya Pradesh - 484 887.
librarian@igntu.ac.in
+91-(07629)-269725